Search Results
Search Results
-
ABOUT START RUNNING OF LIMITATION ACTIONS FOR BREACH OF CONTRACT
The enforceability rule to establish the computation of the extinctive prescription period constitutes the general rule in the law of obligations.
Its traditional interpretation assumes it as a simple matter, the exception of which is the obligation subject to a term or condition precedent. The existence of the credit and the action for its execution or fulfillment constitute the essential trace for its understanding. However, as will be demonstrated in this work, this understanding is not satisfactory, at least in its traditional understanding, to set the time of the prescription of the indemnity action derived from breach of contract. It will be reasoned and concluded that the indemnity action for breach of contract will not apply without the manifestation of the damage.
-
THE DIES A QUO ON EXTINCTIVE PRESCRIPTION IN THE CONTEXT OF DAMAGES ARISING FROM DEFECTIVE SANITARY PRODUCTS. A COMPARATIVE APPROACH
The extinctive prescription of the action for compensation for damage caused by defective medical devices is characterized by the complexity involved in determining the moment from which the period begins to run. This problem invites us to reflect on whether the computation of the limitation period will start from the consumption of the drug, or from the moment the damage manifests itself. In this paper, we propose to make a comparative exposition of the matter by reviewing our legal system, the French and the Spanish ones.
-
THE DIES A QUO IN THE PRESCRIPTION OF ACTIONS FOR BREACH OF CONTRACT IN THE CIVIL CODE
In this paper, the thesis of the computation of the period of the extinguishing prescription of the contractual indemnity action from the breach, in accordance with the provisions of article 2514 of the Civil Code, is defended and justified, since enforceability refers to the performance object of the contract, which is consistent with the existence of a single action for contractual breach to which the different contractual remedies, including compensation for damages, give content.
-
LIMITATION OF ACTION AND BREACH OF CONTRACT
The French law of extinctive prescription, since 2008, establishes a double limitation system based on a subjective delay, starting with the beneficiary’s knowledge, plus a time limit. The application of this system to the remedies for breach of contract is not an easy task. One could say that the knowledge of a breach –or at least the possibility of such knowledge– fixes the starting point but this cannot be satisfactory from the point the view of the elements of each remedy. The same can be said regarding the maximum time limit.
-
SOME CHALLENGES IN APPLYING ARTICLE 2519 OF THE CHILEAN CIVIL CODE. A SYSTEMATIZATION OF THE CURRENT STATE OF AFFAIRS
The purpose of this article is to examine the provisions of article 2519 of the Chilean Civil Code, specifically focusing on the interruption of prescription in cases involving multiple parties, and addressing the unique considerations that arise in the context of exchange obligations and non-contractual solidarity
-
THE FOUNDATION OF THE EXTINCTIVE PRESCRIPTION
The author makes a general theoretical study about the institution of the extinguishing statute of limitations and concretizes his analysis in punctual aspects of the legal regimes of Chile, Colombia, France, Argentina and Uruguay.